Clean power for industrial Gujarat. A solar venture built from land identification to commissioning, and operated for the years that follow.

Co-founder & operator2019 to presentJam Jodhpur, Gujarat
Solar energy imagery from the existing portfolio; illustrative, not verified as the project site.
Solar energy imagery from the existing portfolio; illustrative, not verified as the project site.
0.45 MW
Installed solar capacity
450 kW
Owned capacity
~99%
Reported plant uptime
2019
Operating since
The context

How do you turn infrastructure into a dependable business?

Industrial clients in Morbi needed clean, cost-competitive power. Open Access created a route to serve that demand, but making it work required land, equipment, regulation, commercial agreements and sustained operating discipline.

The full background

I co-founded Pujan Energy in April 2019 with a clear thesis: Gujarat’s industrial clusters were going to need clean, cost-competitive power, and Open Access regulations had finally made it possible to supply it.

The venture has a total installed capacity of 0.45 MW, with 450 KW owned capacity, supplying renewable energy to industrial consumers under Open Access. Our clients are primarily in Morbi’s ceramic and paper mill sectors, energy-intensive industries with strong sustainability mandates and real motivation to decarbonise.

I led the entire build, land identification, feasibility studies, infrastructure planning, regulatory approvals across MSME/Udyog Aadhaar, GETCO, SLDC, PGVCL and local bodies, plant configuration, commissioning, and the ongoing work of keeping it running. Today the plant operates at ~99% uptime.

The decisions

Where I put
the work.

Own the whole execution chain.

Led land identification, feasibility, equipment selection and commissioning. Coordinated multiple vendors across panels, transformers, meters, breakers and cable networks.

Treat compliance as part of operations.

Worked through MSME/Udyog Aadhaar, GETCO, SLDC, PGVCL and local approvals, alongside forecasting, scheduling and grid requirements.

Design for dependable delivery.

Executed Wheeling and Power Sale Agreements for industrial consumers in the ceramic and paper sectors. Maintenance discipline and operational control support approximately 99% reported uptime.

The operating detail

Behind the
headline.

End-to-end project execution

Led every phase from land identification and feasibility to commissioning and sustained operations, not just the build, but the multi-year operating discipline that follows.

Regulatory navigation

Worked through approvals across MSME/Udyog Aadhaar registrations, GETCO, SLDC, PGVCL and local governing bodies. Building strong understanding of power-sector regulations, forecasting & scheduling, and grid compliance, critical for efficient dispatch and revenue realisation.

Plant design & optimisation

Selected solar panel manufacturers, transformers, ABT meters, VCB breakers, and cable networks to maximise solar yield and ensure efficient energy distribution across seasons.

Multi-vendor execution

Directed multi-vendor teams for installation and commissioning, achieving ~99% plant uptime through strong operational control and disciplined maintenance practices.

Wheeling & PSAs under Open Access

Executed Wheeling and Power Sale Agreements under Open Access regulations, supplying renewable energy directly to industrial clients in Morbi’s ceramic and paper mill sectors, supporting their decarbonisation and sustainability goals.

Capital deployment

Managed a sizeable capital investment for the setup and development of solar energy infrastructure, building a B2B clean-energy revenue model positioned within Gujarat’s industrial ecosystem.

What stays with me

Commissioning is a milestone. Reliability is the work.

Another chapter
P.S. Coffee
अच्छी बातें वक़्त लेती हैं।